Check permit drawings against the building code.

Upload the drawing set. CodeTrace reads every sheet, checks each value against the code, and shows the sheet and clause behind every result.

Available soon to plan examiners, building officials, architects, builders and owners adding a laneway suite.

StairFP2, ground floor plan

Stair headroom

OBC 9.8.2.2

At least 1,950 mm

Not dimensioned on any sheet

More information needed

Riser height

OBC 9.8.4.1

125 to 200 mm per riser

14 risers. Floor to floor must be 2,800 mm or less

Needs review

Stair width

OBC 9.8.2.1

At least 860 mm

1,118 mm shown

Meets

41 more checks in this reviewSee the review

Stair widthOBC 9.8.2.1

1,118 mm shownmin. 860 mm

Meets
  1. 01

    Read every sheet

    Floor plans, site plans, schedules and notes. Every dimension, room area and symbol is pulled out with the sheet and the spot it came from.

    PDF, DXF, IFC and ZIP drawing sets

  2. 02

    Match each value to its clause

    Each value is matched to the requirement that applies, from the code edition the permit falls under, with a link to the official text.

    2024 Ontario Building Code, Division B

  3. 03

    See what passes and what fails

    Meets, does not meet, needs review, or more information needed. The calculation is always shown, so anyone can check it.

    Four possible answers for every check

Pick any finding to see where it came from.

The results arrive as a review a building official can check line by line: the value, the sheet, the clause and the answer.

Permit reviewLaneway suite, Toronto. Sheets SP1 to FP3, 2024 Ontario Building Code.
ExportPDFExcelBCFCSVJSON
21Meets
1Does not meet
1Needs review
21More information needed

44 checks run

Most open checks need a value these drawings leave out, such as a stair section or a floor-to-floor height. Each one names what to add.

7 of the 44 checks, picked from this review. Swipe for more.

FP2, ground floor plan, with the checked value outlined

FP2 Ground floor plan

Drawing shows
3'-8" and 3'-9" (1,118 and 1,143 mm)
Code requires
At least 860 mm
Result
Meets

2024 Ontario Building Code, Division B, 9.8.2.1. Sheet FP2.

Who CodeTrace is for.

Plan examiners and building officials

See the sheet and clause behind each result.

Every value arrives with the sheet it came from and the clause it was checked against, so you confirm a result instead of hunting for it.

Architects and designers

Get the fix list before the examiner does.

Run the set before you submit. Each open item says what to add or change, and on which sheet.

Builders and contractors

See which measurements could hold up the permit.

See the values the review depends on before framing starts, from riser heights to door sizes.

Owners adding a laneway suite

Read the result in plain words.

Know what already meets the code and what your designer still needs to show, before the permit office asks.

How CodeTrace checks drawings.

  1. 01

    AI reads the drawings

    Plan sheets, schedules, notes, forms and revisions are read the way an examiner reads them. Each value keeps the sheet and the spot it came from.

  2. 02

    Code rules decide pass or fail

    Each check is a written rule tied to a clause and a code edition, so the same drawings always get the same answer.

  3. 03

    A person confirms

    Values read from a scan, and anything uncertain, wait for a reviewer to confirm. Every decision is kept in an audit trail.

Checks against

  • Ontario Building Code 2024
  • National Building Code 2025
  • BC Building Code
  • Municipal zoning by-laws

Reviews and reports in English and French.

CodeTrace is available soon.

Tell us what you review and which code you work under. We will be in touch as soon as it is ready for your drawings.